Bolu 29.7 MWe Wind Power Plant Project

The company started wind measurements for the 29.7 MWe installed capacity wind power plant project planned to be built in Bolu Province, Göynük, Bulanık region in 2015. The wind measurement report was approved in 2016. Now, the Company is waiting for TEIAS for a tender to be made for the region concerned. 

Tire Solar Energy Project

Technical feasibility and connection studies are carried out on a land which is a properity of our Group in Tire District of Izmir Province. It is a suitable area for unlicensed solar energy invesment. Applications will be made at the best possible time to obtain permission to generate electricity from solar energy.